The Oracle Health Acute Case Management Product Consultant Professional Exam (1Z0-2017) practice page addresses how case-management workflows support coordination of care in acute settings. Its practice questions sample work such as documenting cases, handing active work between teams, supporting discharge transitions, and reviewing reports and system changes.

Exam overview

Exam providerOracle
Exam code1Z0-2017
CategoryIT Certifications

About the Oracle Health Acute Case Management Product Consultant Professional Exam

Acute case-management product work involves configuring workflows so that staff can identify ownership, status, and next steps for active cases. Consultants need to reason about handoffs between case management and utilization review, including what information and action criteria reduce ambiguity. Discharge planning requires coordinating the transition to an appropriate next care setting, such as a skilled nursing facility, while checking that relevant case information is current. System-focused tasks include examining report definitions when records appear missing, investigating delays in visibility of saved work, and assessing how a change may affect downstream teams. Validation should cover both the expected workflow and exception paths, while release preparation helps control the impact of updates. These skills connect application behavior to reliable clinical operations without assuming that a particular workflow fits every facility.

Sample Practice Questions

Review a selection from this exam's published US Practice Tests practice bank.

Question 1

A case-management team is considering whether to use a standardized template for routine notes. Which benefit is a reasonable goal of a well-designed template?

  1. AEnsure that every patient has identical needs and plans
  2. BMake common information easier to document consistently while leaving room for relevant individual details
  3. CReplace professional review of the documented information
  4. DPrevent users from recording information outside the template in all circumstances
Show answerCorrect answer: B

A template can support completeness and consistency for common information, but it should not imply that patients have identical circumstances or remove the need for appropriate individualized documentation.

Question 2

A facility is reviewing how case-management work moves between shifts. Which practice most directly supports reliable handoff of active work?

  1. AMake ownership, current status, and the next expected action readily identifiable
  2. BReplace task details with a general shift summary only
  3. CDelete unfinished work at the end of each shift
  4. DAssign every open item permanently to the first user who touched it
Show answerCorrect answer: A

Clear ownership, status, and next action help the receiving team understand what remains to be done and who is responsible.

Question 3

A case manager identifies that a patient may need a skilled nursing facility after discharge. Which action best supports a safe transition?

  1. ACoordinate assessment of the patient’s needs, required referrals, and receiving-facility arrangements before discharge.
  2. BDocument the possibility and leave all placement work until after the patient leaves.
  3. CTreat the first facility named by the patient as a confirmed placement without checking availability.
  4. DClose the case-management workflow once a referral is entered.
Show answerCorrect answer: A

A safe transition requires matching the patient’s needs with an appropriate destination and coordinating referrals and arrangements before discharge when feasible.

Question 4

When evaluating a case-management report that appears to omit some records, what should a reviewer check about the report definition?

  1. AWhether its filters, date basis, and inclusion criteria match the intended question
  2. BWhether its title uses the facility's preferred wording
  3. CWhether it contains the largest possible number of columns
  4. DWhether it was run by a user with the most senior job title
Show answerCorrect answer: A

Filters, date basis, and inclusion criteria determine which records appear and whether the report answers the intended question. Presentation choices or the runner's title do not establish that the population is correct.

Question 5

A facility is deciding how to handle a proposed change that could affect downstream teams relying on case-management data. What should be included in the change review?

  1. AAssess dependencies and communicate relevant changes to affected downstream users or processes
  2. BReview only the screen used by the team making the change
  3. CAssume downstream processes will adapt without notification
  4. DAvoid documenting the change to prevent confusion
Show answerCorrect answer: A

Changes to shared data or workflows can affect other teams and processes. Reviewing dependencies and communicating relevant impacts supports coordinated adoption and helps prevent avoidable disruption.

Question 6

A case-management workflow includes a handoff to a utilization review team. Which design detail most directly reduces ambiguity at the handoff?

  1. ADefine the event that triggers the handoff and the receiving team's expected next action
  2. BAllow either team to assume the other has accepted the work
  3. CUse the same label for every handoff regardless of its purpose
  4. DSend the handoff only at the end of the month
Show answerCorrect answer: A

A clear trigger and an explicit expected action establish when responsibility moves and what the receiving team should do. This supports dependable coordination across teams.

Question 7

A consultant is helping a facility prepare for a case-management system update. Which preparation best supports a controlled release?

  1. ADocument the change, affected workflows, validation steps, and a plan for addressing issues after release
  2. BMake the change directly in production and tell users afterward
  3. CRely on informal recollection of the prior configuration
  4. DAvoid recording the change so future updates remain flexible
Show answerCorrect answer: A

Documenting the change and its validation and follow-up plans supports traceability, coordinated review, and issue response. Unrecorded or untested production changes increase operational risk.

How to use this practice test

Access the free practice session to answer up to 20 randomly selected questions from the 50-question bank. Questions sample case-management workflow, reporting, handoffs, transitions, and change validation. Results appear after the session, helping you identify which of these practical concepts to revisit.

Preparation tips

  • Map a sample case from initial documentation through handoff and discharge planning; note the owner, required information, and next action at each step.
  • For a report with missing cases, inspect its filters, date ranges, status criteria, and other definition settings before concluding that records were not saved.
  • When reviewing workflow changes, trace effects on utilization review and other downstream users, then identify expected behavior for both standard and exception paths.
  • Practice investigating delayed work-item visibility by distinguishing saving, refresh or synchronization behavior, access permissions, and user-facing status.
  • Before using case information to support a transition decision, identify which details may have changed and what current source or confirmation is needed.